Elstree Aerodrome Hanger
Project background:
Elstree Aerodrome required an upgrade to an existing hanger which needed demolishing alongside an old workshop, and starting again. The new hanger was built with 80mm composite panel, included a polished concrete floor, full spec sliding hanger door and 230m2 of office space with bathrooms and kitchen.
Key Works:
- Demolition
- Treatment plant installation
- Concrete pouring leveling and polishing
- Steel frame construction
- Internal fit out
- 278 works
- Drainage Utilities